Installation, commissioning and use of Chinese herbal medicine crushing unit

First, carefully inspect the equipment for any damages incurred during transportation upon opening the box. Then, proceed to install the main machine, auxiliary machine, and electrical box in their designated positions. Connect the main machine, auxiliary machine, and pipes securely, ensuring a tight seal for the pipe connections. It is crucial to connect each individual machine, pipe, and flange with the appropriate wiring and ensure a reliable grounding to prevent any potential risks of dust accumulation or explosions caused by static sparks.

 


Prior to initiating trial operation for each independent machine, it is crucial to conduct a thorough check for any metallic objects inside the machine, and eliminate them if found. Furthermore, it is imperative to inspect and verify the adequacy of bolt strength, belt tension, and the reliability of the protective covering. Finally, commence the trial run of the equipment, making note of any abnormalities, and conducting additional checks as needed.

 


3. Start each motor in the following order:
To begin the crushing process, make sure to close the damper and activate the dust collector fan. These steps will ensure that the host machine runs smoothly and the dust is effectively collected.

 


Once the empty truck has been running for 5 minutes, it is essential for the operator to closely monitor the instruments on the control cabinet. Following the attainment of a stable no-load current, the operator can then commence the feeding process.

 


To ensure proper feeding operation, it is important to avoid exceeding the current limit of 1. In the event of a sudden increase in current, it is recommended to close the material door gate and reduce the feeding speed. Conversely, when the current decreases, it is advisable to gradually open the gate to the appropriate opening. By following these guidelines, the feeding process can be effectively controlled and maintained at an optimal level.

 


In order to maintain proper functioning of the machine, it is crucial to keep the filter bag unblocked. If the current fails to decrease to less than 1 after closing the feed gate, it is recommended to stop the machine immediately. To address this issue, tapping the bag can be a helpful step before restarting the machine. It is important to adhere to the aforementioned startup sequence while restarting the machine to ensure optimal performance.

 


The normal shutdown sequence can be performed in the following order: we start by ensuring that the system is properly saved and all tasks are completed. Then, we proceed to close any open applications and programs. After that, we can safely shut down the computer or device. It is important to follow this sequence to ensure a smooth and efficient shutdown process.

 


After running for 5 minutes, please stop the pulverizer host and close the hopper gate. Additionally, remember to stop the dust collector fan.

 


Troubleshooting:
To prevent any damage to the machine parts and malfunction when dealing with unwanted noise or a rise in current, it is advised to promptly turn off the air switch. Further inspection should be performed before continuing operation. It is important to take caution when adding materials to the machine so that metal objects do not get caught.

 